ThamesPilot logo Thames Pilot logo
search border search border
  search title  
advanced search
search border search border
 
  Home     Themes     Where to go     Partners     Send an e-postcard  
 
search tips Oxford Buckinghamshire Henley Maidenhead Wokingham Richmond Hounslow Newham Bexley Lambeth Wandsworth Kingston Kent  
   
The river environment
 
Theme Sections
Introduction
Early settlement
Fords and ferries
Bridges and tolls
Drought
Flood
Ice
The Great Stink
Strong brew
Seething Wells
Landfill today
Riverbank
Sky above
Swan Upping
 
 
 
More Themes
Thames Riverside Pubs
Special Collections
From source to sea
Working on and along the river
The river environment
Enjoying the river
The changing riverside landscape
The river in art
Timeline Gallery
  Themes Homepage > Riverbank
 
The river environment
Riverbank

go to first sectiongo to previous sectionprevious sectionnext sectiongo to next sectiongo to last section
Willows
The willow in its various forms was a feature of the Thames riverbank for hundreds of years. Harvesting was achieved using one of two methods. Pollarding was the term for cutting off branches at the top of the trunk, whereas coppicing involved cutting off the the thin young branches at ground level.
Pollarding willows
Pollarding willows
 
Osier cutting
Osier cutting
Osiers
The osier willow, Salix viminalis, was important to both the riverside economy and the local wildlife. A whole industry revolved around weaving the pliant stems into baskets, crates, lobster pots and eel-traps. A well established bed could produce up to three tons of rods per acre, which when harvested could be valued at as much as £15 per acre in 1900.
 
Harvesting took place around March each year. The rods of about nine feet in length were then left to soak for a month before being peeled. Varieties produced withies of different thickness suitable for the making of fine baskets or large strong crates. Osier peeling
Osier peeling
 
Reed cutting
Reed cutting
Reeds
The Shakespeare Globe theatre, recently reconstructed in London, is the first public building to be thatched in water reed since the fire of London in 1666. At one time, the Thames river bank would have been lined in reed beds, helping to prevent erosion, and being an invaluable nesting site for bird life.
 
The transport of brick and slate was extremely difficult until the introduction of the railways. Therefore, the use of local materials was an easy and cheap solution. Reeds provided an excellent thatch for the timber and wattle buildings of the period. Rushes drying
Rushes drying
 
 
go to first sectiongo to previous sectionprevious sectionnext sectiongo to next sectiongo to last section
 
  Themes Homepage > Riverbank
   
 
  Copyright Info | Sitemap | About ThamesPilot | Contact Us | Links
 Working in partnership with New Opportunities Fund logo
SoPSE logo